Plastering

The most common approach to re-plastering is using a dense sand and cement render as a backing coat incorporating a waterproof additive, followed by a gypsum skim coat which is applied to give a smooth finish.

 

Decoration

Following re-plastering a minimum of at least two weeks must elapse before the new plaster can be decorated and all areas need to be visibly dry.  At this time decoration should only be with a water based permeable emulsion, vinyl paints should not be used.